Eagle Ridge HOA
  • Home
  • Association Docs
    • Assessments
    • CC&R's >
      • Annexation Docs
    • Bylaws
    • Board Resolutions
    • Budgets >
      • Budgets Archive
      • Financial Reports
      • Reserve Study
    • Architectural Guidelines >
      • Architectural Application
    • Minutes Archive
  • FAQ
  • Contact Us
    • Homeowner Information Form
    • Common Area Work Request
    • Violation Report
  • Community Map

ARCHITECTURAL guidelines



Architectural Control CommitteeThe architectural review process at Eagle Ridge HOA is described in our CC&Rs for Eagle Ridge first recorded in 1996 and amended from time to time thereafter. It is administered by an Architectural Control Committee (ACC) elected by the members of the HOA.
The architectural review process, which is formalized by documents you can review via this www.eagleridge-hoa.com resource link, are designed to preserve the visual impression of Eagle Ridge as a distinctive and desirable place to live.
 
This design review process is not intended to be cumbersome or expensive. It is intended to achieve a pattern of quality and aesthetic benefit, and preserve the visual impression of Eagle Ridge as a distinctive and desirable place in which to live.
 
Landscaping, fencing, building form, permanent structures, materials, and colors all contribute to an overall community image that is readily identifiable as a high quality development. To that end, we have added the following amendment below to the ACC Design Guidelines.
 
Permanent Exterior Lighting: The following guidelines are being implemented for application of permanent eave, soffit, and roofline exterior house lighting.
  1. Lighting must face downward and must not create excessive glare or shine on adjacent homes
  2. Fixtures may only be installed on the front of the residence or side(s) that face a public street (corner lots), and not on the side(s) of the residence facing adjacent residences.
  3. Lighting product (including wiring), must be permanently secured and concealed in channels that closely match the house color. Channels not hidden from sight under the eaves should be painted to match the house. Fixtures should not be readily visible from the street during daylight hours.
  4. During non-seasonal holiday and special occasion times, only soft to warm white tones are permitted
  5. Lights may not flash, blink or change colors unless for seasonal holidays or special occasions such as Birthdays, Weddings, Anniversaries, Graduations, Game Day, etc.

 By following the Association's guidelines, residents will protect and enhance each property owner’s investment in their home.
  
Common Area Fence Paint and Stain Codes:
The product is Woodscapes Cedar stain and paint codes are - SW3034, A15T54. Sherwin Williams

EGR ARC Guidelines - Permanent Lighting - Updated 12/7/2025
File Size: 450 kb
File Type: pdf
Download File

ACC Guidelines Turf Replacement 2023
File Size: 39 kb
File Type: pdf
Download File

Eagle Ridge Design Guidelines Updated 2023
File Size: 23 kb
File Type: pdf
Download File

Eagle Ridge Architectural Guidelines Updated 08.12.16
File Size: 81 kb
File Type: pdf
Download File

Architectural Application
File Size: 352 kb
File Type: pdf
Download File

Eagle Ridge Drainage & Rear Yard Landscaping 09.06.09
File Size: 119 kb
File Type: pdf
Download File

Eagle Ridge Architectural Guideline Matrix Addition 11 Phase1
File Size: 24 kb
File Type: pdf
Download File

Eagle Ridge Common Area Use Application
File Size: 320 kb
File Type: pdf
Download File

Eagle Ridge Architectural Guideline Matrix Editions 1-10
File Size: 77 kb
File Type: pdf
Download File

Eagle Ridge Construction Guide 09.15.14
File Size: 168 kb
File Type: pdf
Download File

Architectural Application (online form)